Skip to content

Form F-00 · Schedule of renewalsBasingstoke & district · 2026 cycle

Renewals tracked. Booked without prompting.

Fenwick Compliance Plumbing holds the renewal calendar for landlord and managing-agent portfolios across Basingstoke. Every landlord gas safety certificate on this wall was booked before anyone had to ask — CP12 due dates tracked twelve months out, visits arranged with the tenant directly, paperwork filed the same day.

Request a portfolio audit Read the register of services

Extract · Renewal registerSchedule as of 19 Aug 2026

  • BSK-0417CP12 DUE 14 SEP 2026VISIT SET 28 AUG 2026Booked
  • BSK-1130CP12 DUE 08 SEP 2026VISIT SET 24 AUG 2026Booked
  • BSK-1244CP12 DUE 21 SEP 2026VISIT SET 04 SEP 2026Booked
  • BSK-0076CP12 DUE 29 SEP 2026VISIT SET 11 SEP 2026Booked
  • BSK-0892CP12 DUE 02 OCT 2026VISIT SET 17 SEP 2026Booked
  • BSK-0651CP12 DUE 17 OCT 2026VISIT SET 30 SEP 2026Booked
  • BSK-0533CP12 DUE 05 NOV 2026VISIT SET 09 OCT 2026Booked
2,000Certificates filed a year
40+Properties per managed portfolio
2006Register in operation since
4.5/5Google rating · 78 reviews

Extract shown with property references anonymised · figures stated per annum across managed portfolios

Fenwick Compliance Plumbing · Register 2026Page 01 / 08

SEC 02 / What we file

Eight document types. One filing system.

Compliance plumbing in Basingstoke, listed the way you will receive it — as paperwork on file. Reference, scope, and when the document reaches your portfolio file.

A gloved hand pressing a red date stamp onto a completed gas safety certificate on a clipboard, seen from directly above
Plate 02 · Certificate stamped at deskFiled same day
  • F-01 / CP12

    Landlord gas safety records

    The annual landlord gas safety certificate for Basingstoke tenancies: every appliance and flue checked, defects noted against the property, and the CP12 issued to your file without a reminder from your office.

    Uploaded same day
  • F-02 / BLR

    Boiler servicing across portfolios

    Landlord boiler servicing in Basingstoke scheduled alongside the gas safety visit wherever the calendar allows — one access arrangement, two documents on file.

    Record same day
  • F-03 / LRA

    Legionella risk assessment & testing

    A Legionella risk assessment Basingstoke agents can hand straight to an auditor: stored-water temperatures, tank condition and outlets checked, the written assessment filed against each property.

    Report to file
  • F-04 / UVC

    Unvented cylinder servicing

    Annual unvented cylinder service in Basingstoke — safety controls, expansion and discharge pipework checked, the service record entered on the renewal calendar for next year.

    Record same day
  • F-05 / VOID

    Void-property inspections & drain-downs

    Empty properties inspected, systems drained down against frost, and the void logged so the file shows the property was protected between tenancies.

    Log per visit
  • F-06 / PLNT

    Communal plant-room maintenance

    Commercial plant room maintenance for Basingstoke blocks: plant inspected on planned cycles, valves tagged and legible, works recorded against the block's own file — block management plumbing run as a schedule, not a call-out.

    Log per cycle
  • F-07 / REAC

    Reactive repairs for managed tenancies

    Repairs raised by your office, attended within agreed terms, photographed before and after, and the photo log filed against the property the same visit.

    Photo log per visit
  • F-08 / REN

    Renewal scheduling & certificate archiving

    The standing service behind everything above: due dates tracked twelve months out, visits booked without prompting, certificates archived and retrievable whenever an auditor asks.

    Standing entry

Fenwick Compliance Plumbing · Register 2026Page 02 / 08

SEC 03 / Portfolio intake

How forty-plus properties are taken on

Managed portfolios of 40+ properties are the specialism because the method is built for the scale. This is the intake procedure for portfolio gas safety records across Basingstoke and north Hampshire, in the order it runs.

  1. Step 01

    The handover audit

    Every existing certificate is reviewed — CP12s, service records, legionella assessments. Expiry dates are verified against the properties, gaps are flagged in red, and missing documents are listed for recovery. You receive the whole position as a single schedule.

  2. Step 02

    The renewal calendar is built

    Every due date is entered twelve months out and sequenced street by street, so neighbouring properties share a visit day. From this point the calendar is Fenwick's to keep — not yours to remember.

  3. Step 03

    The access register is compiled

    Key safes, agent contacts and tenant notes are recorded per property. Access becomes our problem, arranged directly with the tenant on a documented schedule — your office stops being the switchboard.

  4. Step 04

    The first cycle is booked

    The first round of visits goes into the diary without a single prompt from your side. From here the register runs itself: a due date approaches, a visit is booked, a certificate is filed — and next year's date is already entered.

A desk during a portfolio handover with stacked property files, a printed renewal calendar with circled dates and a triplicate job-sheet pad
Plate 03 · Handover in progressIntake stage 01

Fenwick Compliance Plumbing · Register 2026Page 03 / 08

SEC 04 / Keys, safes & access notes

Access arranged by us. Logged either way.

The unglamorous half of letting agent plumbing compliance is getting through the front door. Fenwick holds that problem — and holds it on paper. Tenant access is arranged directly by us, on a documented schedule, for every property on the register.

A key safe mounted beside a rain-flecked front door on a terraced house in flat grey morning light, with a hi-vis sleeve at the edge of the frame
Plate 04 · Arranged access, 07:40Basingstoke district
  • Key-safe codes are held under a written protocol — released to the attending engineer for the visit, never copied onto a job sheet.
  • Tenant contact runs a documented three-touch schedule — message, call, letter — timed ahead of the due date, with every attempt logged against the property.
  • Access notes are recorded per property: entrances, pets, working patterns, anything the next engineer needs to know before knocking.
  • A failed access is not a lost visit. It is recorded, evidenced to the file, and rebooked automatically — without your office being prompted to chase.

Access noteRef BSK-0233

Entry
Rear gate · code held
Occupant
Dog on premises · AM only
Key safe
On site · code ████ under protocol
Contact
T1 SMS · T2 call · T3 letter
Last visit
Completed · photographed · filed
Next due
03 MAR 2027

Reproduced from the register · details anonymised

Fenwick Compliance Plumbing · Register 2026Page 04 / 08

SEC 05 / The same-day paper trail

Boiler to inbox, the same working day

What happens after a visit, hour by hour. No chasing, no "it's in the post" — the paper trail is part of the job, not an admin task for later. Certificates are issued and uploaded the same day, every time.

  1. T 09:12

    Visit closed on site

    The engineer completes the checks and photographs the work before leaving the property — every visit is photographed and recorded against the address.

    Logged
  2. T 09:47

    Certificate generated

    The CP12 is generated and date-stamped while the details are still warm — reference, appliances, outcomes, all entered against the property record.

    Issued
  3. T 11:26

    Filed to your portfolio

    The certificate is uploaded to your portfolio file the same day. When the auditor's email arrives, the answer is already on file.

    Uploaded
  4. T 11:31

    Next renewal entered

    Next year's due date goes onto the renewal wall before the van leaves the street. The cycle is closed — and already open again.

    Booked
A fluorescent-lit communal plant room with laminated tags on every valve and an engineer's tablet on the pipework showing a completed digital certificate
Plate 05 · Plant room, certificate closed on siteCommercial plant room maintenance · Basingstoke
2,000 Certificates filed a year

Issued and uploaded the same working day. The register has been running since 2006; the paper trail is the product.

Fenwick Compliance Plumbing · Register 2026Page 05 / 08

SEC 06 / Statements on file

Correspondence from the people who used to do the chasing

Statements from managing agents and portfolio landlords, filed as received. Cross-referenced against a 4.5/5 Google rating from 78 reviews.

Statement · Ref ST-041Received

Before Fenwick, gas safety ran off a spreadsheet and a reminder I was always slightly afraid of. Now the renewal is booked before I have thought to ask for it, and the certificate is in the file the same day the visit happens. I have stopped checking, which is the highest compliment I can pay a contractor.

Lettings manager · 62 units · Basingstoke

Statement · Ref ST-047Received

They took a shoebox of paperwork and handed back a renewal calendar. When our auditor asked for the portfolio gas safety records, the file was already complete — every CP12, every service record, dated and in order. That question used to cost me a weekend.

Portfolio landlord · 40+ properties · Basingstoke & Tadley

Statement · Ref ST-052Received

Access was always the sticking point — tenants who never answer, keys that never turn up. Fenwick arranges access directly and logs every attempt, so a failed visit is a record rather than an argument. My inbox is measurably quieter.

Block managing agent · Basingstoke

Cross-reference: Google rating 4.5/5 · 78 reviews on file

A half-open filing cabinet drawer of suspension files with typed tabs, one letter pulled slightly forward
Plate 06 · Correspondence drawerStatements filed on receipt

Fenwick Compliance Plumbing · Register 2026Page 06 / 08

SEC 07 / District of operation

Basingstoke, and the catchment a lettings desk actually manages

Coverage stated like a schedule appendix. If your portfolio sits inside the planned-cycle district below, it can go on the register.

Schematic · planned-cycle district · not to scale

A work van parked square-on outside a block of flats in flat grey morning light
Plate 07 · Unit on roundsBasingstoke district
  • Basingstoke town centreRG21
  • South Ham · Brighton Hill · KempshottRG22
  • Oakley · WortingRG23
  • Chineham · Popley · Old BasingRG24
  • Overton · CliddesdenRG25
  • Tadley · BramleyRG26
  • Hook · Hartley WintneyRG27
  • WhitchurchRG28
  • Odiham · North WarnboroughRG29

Response terms · portfolio clients

Portfolio work runs on planned cycles booked well in advance — that is the point of the register. Reactive repairs for managed tenancies within the district are scheduled within agreed terms during office hours. We file paperwork; we do not perform emergency theatre.

Fenwick Compliance Plumbing · Register 2026Page 07 / 08

SEC 08 / Open a file

Open a file, and the chasing stops being your job

If you have ever wondered who manages CP12 renewals in Basingstoke, the honest answer is usually nobody — until a file is opened. This intake sheet is the first document Fenwick files for you. A portfolio audit and renewal calendar proposal follows within two working days.

Form F-00 · Portfolio intake sheetFenwick Compliance Plumbing

04Current certificate positionrequired
07Preferred contact

Logged during office hours and acknowledged the same working day. Portfolio audit and renewal calendar proposal within two working days.

How we handle what you send us

Logged

Your file is open

The intake sheet has been logged against a new portfolio file. Expect an acknowledgement the same working day, and a portfolio audit with a renewal calendar proposal within two working days. From here, the chasing is ours.

Office hours

Monday–Thursday
08:00–17:00
Friday
08:00–16:30

On record

  • Established 2006
  • £5m public liability cover
  • Certificates uploaded same day
  • Every visit photographed & filed
  • Tenant access arranged by us

What happens next

Your submission opens a file. We review your certificate position, price the cycle, and return a renewal calendar proposal — every due date twelve months out, every access arrangement ours to make.

A blank triplicate intake form on a clipboard with pink and yellow carbon-copy sheets visible and a ballpoint pen resting across it
Plate 08 · Intake sheet, unfiledAwaiting entry

Fenwick Compliance Plumbing · Register 2026Page 08 / 08